BW-652
Plastic
Plastic
PP Compression Fitting
Blue and Black
Bestway
China
DIN
Female
Round
20mm-110mm
for HDPE Pipe
20-110
74112900
Material | Brass body Brass can be CuZn39Pb3,CZ121,CZ122,C37710,CW614N,CW617N,DZR BRASS, etc. |
Surface | Natural brass or Nickel Plated |
Size | 1/2" to 2" |
Testing Pressure | 100% tested with 0.6MPa - 0.8MPa by air. |
Samples Time | 1) 2 days - For our existing samples for reference 2) 15 days - If new size, need make the new mould |
OEM Acceptable | Yes |
Production Capacity | 100,000 pcs each month |
Packing Details | Poly bag, inner box, out carton and pallet. |
Payment Term | T/T ,L/C,,D/P,D/A,PAYPAL,WESTERN UNION |
Delivery Time | 20 days to 40 days after confirming the order |
Minimum Order Quantity | 1000-3000 Pieces |
Material | Brass body Brass can be CuZn39Pb3,CZ121,CZ122,C37710,CW614N,CW617N,DZR BRASS, etc. |
Surface | Natural brass or Nickel Plated |
Size | 1/2" to 2" |
Testing Pressure | 100% tested with 0.6MPa - 0.8MPa by air. |
Samples Time | 1) 2 days - For our existing samples for reference 2) 15 days - If new size, need make the new mould |
OEM Acceptable | Yes |
Production Capacity | 100,000 pcs each month |
Packing Details | Poly bag, inner box, out carton and pallet. |
Payment Term | T/T ,L/C,,D/P,D/A,PAYPAL,WESTERN UNION |
Delivery Time | 20 days to 40 days after confirming the order |
Minimum Order Quantity | 1000-3000 Pieces |