BW-LFZ01
Single Hole
Traditional
Single Handle
Stainless Steel
Common Basin, Stemmed Basin
Hydraulic
Medium Pressure
Bestway
China
Brass
Brushed
Induction, Magnetization
Deck Mounted
CE, RoHS, CSA, GS, UL, ETL, CB, LFGB
C46500 Lead Free Brass Bibcock Mip
1/2"-2"
Natural Brass or Nickel Plated
1/2"-4"
8481804090
Material | Brass Body, Brass Bonnet, brass ball, steel handle Brass can be CuZn39Pb3, CZ121, C37710, CW614N, CW617N, DZR, etc |
Surface | Natural brass or Nickel plated |
Size | 1/2"-4" |
Testing Pressure | 100% tested with 0.6MPa - 0.8MPa by air. |
Thread | BSP & NPT for selecting |
Samples Time | 1) 2 days - For our existing samples for reference 2) 15 days - If new size, need make the new mould |
OEM Acceptable | Yes |
Production Capacity | 100,000 pcs each month |
Packing Details | Poly bag, inner box, out carton and pallet. |
Payment Term | T/T ,L/C,,D/P,D/A,PAYPAL,WESTERN UNION |
Delivery Time | 20 days to 40 days after confirming the order |
Minimum Order Quantity | 300-2000 Pieces |
Material | Brass Body, Brass Bonnet, brass ball, steel handle Brass can be CuZn39Pb3, CZ121, C37710, CW614N, CW617N, DZR, etc |
Surface | Natural brass or Nickel plated |
Size | 1/2"-4" |
Testing Pressure | 100% tested with 0.6MPa - 0.8MPa by air. |
Thread | BSP & NPT for selecting |
Samples Time | 1) 2 days - For our existing samples for reference 2) 15 days - If new size, need make the new mould |
OEM Acceptable | Yes |
Production Capacity | 100,000 pcs each month |
Packing Details | Poly bag, inner box, out carton and pallet. |
Payment Term | T/T ,L/C,,D/P,D/A,PAYPAL,WESTERN UNION |
Delivery Time | 20 days to 40 days after confirming the order |
Minimum Order Quantity | 300-2000 Pieces |